Prairie Hill Fruits

Prairie Hill Fruits

Client: Prairie Hill Fruits

Project Manager: Eric Senneker

Date: October 19, 2019

Customer: Prairie Hill Fruits.

Start Date: August 1, 2019

Completion Date: March 30, 2020

Type: Commercial

Usage: Berry Process Facility 

Structure: Engineered Structural Steel

Building Envelope: Insulated Metal Panel 

Square Foot: 16200 sqft Process/Storage Area c/w 11250 sqft 2 story Office

Features: 

  • Engineered Steel Structure
  • Steel Screw Piles
  • Concrete grade beams
  • Concrete Floor c/w CFIA Compliant Floor Covering
  • Roof construction: Steel Joists, Q deck, poly, sloped foam package, roof membrane
  • Exterior Wall Construction: Structural Steel, Insulated Metal Panel
  • Loading Docks, Freezer Storage, Processing